1-Process Flow Chart

1-Process Flow Chart - QLQ zipper manufacturing machine

2-Process Video

3-Process Details

Step 1: Gapping

Machine: QLQ-DGM Material: Plastic Long-chain Zipper

▶ Watch on YouTube

Please click the following photos for more details.

Step 1: Gapping - QLQ zipper manufacturing machine
Step 1: Gapping - QLQ zipper manufacturing machine
Step 1: Gapping - QLQ zipper manufacturing machine

Step 2: Film Sealing

Machine: QLQ-UFSM Material: Transparent Film, Semi-Transparent Film, Fabric Film, Tafeta Film

▶ Watch on YouTube

Please click the following photos for more details.

Step 2: Film Sealing - QLQ zipper manufacturing machine
Step 2: Film Sealing - QLQ zipper manufacturing machine
Step 2: Film Sealing - QLQ zipper manufacturing machine

Step 3: Hole Punching

Machine: QLQ-HPM and Hole Punching Mould

▶ Watch on YouTube

Please click the following photos for more details.

Step 3: Hole Punching - QLQ zipper manufacturing machine
Step 3: Hole Punching - QLQ zipper manufacturing machine
Step 3: Hole Punching - QLQ zipper manufacturing machine

Step 4: Pin Box with Side Insert Top Stop Injection

Machine: QLQ-DOIM-1 Material: POM Material

▶ Watch on YouTube

Please click the following photos for more details.

Step 4: Pin Box with Side Insert Top Stop Injection - QLQ zipper manufacturing machine
Step 4: Pin Box with Side Insert Top Stop Injection - QLQ zipper manufacturing machine
Step 4: Pin Box with Side Insert Top Stop Injection - QLQ zipper manufacturing machine

Step 5: Waste Material Picking Slider Mounting & Zipper Combining

Machine: QLQ-DPSMCM

▶ Watch on YouTube

Please click the following photos for more details.

Step 5: Waste Material Picking Slider Mounting & Zipper Combining - QLQ zipper manufacturing machine
Step 5: Waste Material Picking Slider Mounting & Zipper Combining - QLQ zipper manufacturing machine
Step 5: Waste Material Picking Slider Mounting & Zipper Combining - QLQ zipper manufacturing machine

Step 6: Normal Top Stop Injection

Machine: QLQ-DCIM

▶ Watch on YouTube

Please click the following photos for more details.

Step 6: Normal Top Stop Injection - QLQ zipper manufacturing machine
Step 6: Normal Top Stop Injection - QLQ zipper manufacturing machine
Step 6: Normal Top Stop Injection - QLQ zipper manufacturing machine

Step 7: POM Crushing

Machine: QLQ-DCM

▶ Watch on YouTube

Please click the following photos for more details.

Step 7: POM Crushing - QLQ zipper manufacturing machine
Step 7: POM Crushing - QLQ zipper manufacturing machine
Step 7: POM Crushing - QLQ zipper manufacturing machine

Step 8: Cutting

Machine: QLQ-OCM-1

▶ Watch on YouTube

Please click the following photos for more details.

Step 8: Cutting - QLQ zipper manufacturing machine
Step 8: Cutting - QLQ zipper manufacturing machine
Step 8: Cutting - QLQ zipper manufacturing machine

Machine: QLQ-OCM-3

▶ Watch on YouTube

Please click the following photos for more details.

Step 8: Cutting - QLQ zipper manufacturing machine
Step 8: Cutting - QLQ zipper manufacturing machine
Step 8: Cutting - QLQ zipper manufacturing machine
Small Line Reference
10,000 pcs: 225 m² / 100 kW / 20–30 staff
Medium Line Reference
50,000 pcs: 530 m² / 260 kW / 55–80 staff
Mold Life
Standard 100,000–300,000 shots
Mold Types
Dedicated per size; inserts for left/right variants
Two-Color Support
Mono and two-color injection machines
Testing Standards
BS 3084 / QB/T 2171

Production Standards & Quality Gates

The checkpoints a zipper factory should run to keep output consistent and traceable.

StageCheckFrequencyAcceptance Limit
POM material receivingBatch certificate, moisture checkEvery batchDry pellets before injection; consistent supplier
Injection formingTooth dimensions, pitch, flashEvery 30 minNo flash, no short shot; pitch within tolerance
Cooling & annealingCooling time and temperaturePer moldComplete cooling before handling to prevent warp
Gapping & finishingGap position and stop fitEvery 2 hClean gap; stop fits without force
Color & surfaceShade vs masterbatch standardPer batchΔE ≤ 1.0; no streaks or dull areas
Finished zipperPull force, slider fit, AQLPer lotPer BS 3084; AQL 2.5

Workshop Layout & Material Flow

Zone planning keeps material moving one way and keeps dyeing, plating and painting separated from packing.

ZoneSpace SharePlanning Notes
Material & drying15%POM storage with drying hoppers; dust-controlled
Injection area35%Injection machines with cooling water loop; mold rack nearby
Finishing30%Gapping, stops, slider mounting, cutting, inspection
Packing & QC20%Testing, packing and finished-goods storage
Utilities—Air compressor, cooling water, granule crusher for sprue recycling

Personnel Training & Assessment

A practical skill matrix with training time and measurable KPIs per role.

RoleCore SkillsTrainingAssessment KPI
Injection operatorsMold change, temperature control, shot inspection1–2 weeksFirst-pass yield; flash/short-shot rate; mold change time
Mold technicianMold maintenance, cavity cleaning, insert change2–4 weeksMold downtime; preventive maintenance compliance
Color controllerMasterbatch ratio, shade checking1 weekColor reject rate; batch consistency
QC inspectorPitch, pull force, slider fit, AQL1–2 weeksMissed-defect rate; report accuracy

Common Problems and How to Fix Them

The failures that show up most often in real projects, with the cause and the practical fix.

ProblemWhy It HappensPractical Fix
Color inconsistent between batchesPOM not dried, temperature drift, masterbatch ratio wrong, cooling time shortUse drying hopper; stabilize temperature zones; control masterbatch ratio; keep supplier consistent
Flash or short shot on teethClamp force, injection pressure, mold venting, material moistureCheck clamp and pressure; clean vents; dry material; verify mold fit
Tooth warp after coolingCooling time too short, mold temperature unevenExtend cooling; balance mold temperature; check annealing step
Slider does not fit plastic chainTooth profile or pitch drift, slider mouth mismatchVerify pitch gauge; check mold wear; match slider to chain sample
Mold wears earlyPoor cooling design, lack of maintenance, wrong steelFollow maintenance schedule; clean and lubricate; upgrade inserts
72-hour dimension changesShrinkage allowance not applied to moving coreMachine core to final-product size minus shrinkage; confirm drawing before machining

Step-by-Step Production Guide

A practical sequence that can be adapted to your own project.

1
Choose product & sizes
Vislon #3–#10, mono or two-color, open/closed-end
2
Select injection machine
Standard or high-speed two-color machine per volume
3
Plan molds
One mold per size/tooth type; inserts for variants
4
Define finishing line
Gapping, stops, slider mounting, cutting and testing
5
Request layout & power plan
QLQ provides machine list, layout and mold plan
6
Prepare utilities
Cooling water, air, drying hoppers and crusher
7
Install & commission
On-site engineers; sample runs per size
8
Qualify molds
Run 72-hour samples; confirm dimensions and shrinkage
9
Train team
Operators, mold technician and QC
10
Scale output
Add molds or a second machine after stability

Working Data & Formula Notes

Plastic Zipper Process Data

Reference values from QLQ project data and standard plastic zipper practice. Confirm final parameters with your line supplier.

Component / ParameterWorking Value / RoleWhat Changes Mean
POM dryingDrying hopper before injection; consistent moistureWet pellets = steam streaks, flash and brittle teeth; keep drying continuous
Injection temperature zonesStable zones per material gradeTemperature drift = color change and dimension variation between batches
Cooling timeComplete cooling per mold before ejectionShort cooling = warp and delayed shrinkage; 72-hour dimension check recommended
Mold cavity count2-cavity typical; 4-cavity for high volumeMore cavities = higher output but longer fill; cooling must be balanced
Masterbatch ratioConsistent ratio per shadeRatio drift = ΔE shift; record ratio per batch
Tooth pitch checkPitch gauge every 30 minPitch drift = slider jamming and pull-force failure; check mold wear first

QLQ Full-Solution Coverage

QLQ supplies the complete set of high-quality zipper manufacturing equipment, molds and materials, and is the only manufacturer in China covering the full process chain from raw materials through electroplating and painting. Machines, molds, chemicals and consumables are matched as one system, so the line starts faster and runs more predictably.

ScopeWhat QLQ Provides
Front-end equipmentPlastic zipper injection machines (mono and two-color), tape feeding and cooling
Finishing equipmentGapping, stop injection, slider mounting, cutting and testing machines
Molds & toolingVislon teeth molds, injection molds and inserts; 0.02 mm precision, H13/SKD61 steel
Materials & consumablesPOM sourcing guidance, color masterbatch, films and spare parts with long-term supply
Surface treatmentShiny film sealing, lacquer and UV coating equipment for finished chain
ServicesLayout design, mold plan, installation, training and remote support

Frequently Asked Questions

Do I need injection machines or dedicated forming machines for plastic zippers?

Plastic/vislon zippers are made by injection molding. You need injection machines, one mold per size and tooth type, tape feeding/cooling, then gapping, stops, slider mounting and cutting machines.

How much does a plastic zipper mold cost and how long does it last?

Mold price depends on size and cavity count; life is typically 100,000–300,000 shots with H13/SKD61 steel and regular maintenance. One mold is dedicated per size, with inserts for left/right variants.

Why is the color different between batches?

Usually POM moisture, injection temperature drift, masterbatch ratio or cooling time. Use a drying hopper, stabilize temperature zones and record the ratio per batch.

What equipment is needed for two-way open-end plastic zippers?

An open-end injection mold with two insert pins, slider mounting that handles two sliders, and box-pin/insert-pin assembly. QLQ supports #5, #8 and #10 two-way open-end sizes.

Can plastic zipper teeth machines also run metal parts?

No. Metal Y-teeth use stamping machines with different dies and materials. Plastic teeth use injection machines with POM and dedicated molds.

Why do finished dimensions change after a few days?

Plastic parts shrink after molding. The mold core must be machined to final-product size minus shrinkage allowance. Confirm the drawing before machining to avoid rework.

What should a new plastic zipper factory test?

At minimum pitch and dimension checks, pull-force tester, slider fit and color comparison. Add washing and fastness testing when supplying garments or brands.

What Would You Like to Solve?

Share your product range, target output, workshop size and the process problem you are facing. QLQ engineering will help you check the machine list, layout, parameters and troubleshooting steps for your specific case.

Factory Setup Guide: Plastic Zipper Production Workshop

Plastic zipper production is injection-based, so material drying, mold maintenance and stable power are the key planning factors. The table below summarizes realistic planning figures for a typical mid-size plastic zipper line.

Planning ItemRecommended Standard for a Typical Mid-Size Line
Quality Control StandardsBS 3084 / QB/T 2171 compliance with hourly teeth-dimension and pitch checks; POM material batch records; slider smoothness and pull-force tests on every batch; color consistency checks against retained samples; final AQL 2.5 sampling.
Workshop Area Required500–1,200 m² production area plus 150–250 m² warehouse; dust-controlled injection zone; separate sealing, lacquering, cutting and packing areas with ventilation.
Workforce Needed10–22 workers across two shifts: injection and chain operators, finishing-line operators, 1–2 mold technicians, 1–2 QC inspectors and 1 production manager.
Power Supply100–220 kW connected load; 380V/50Hz three-phase (or 220V/480V 60Hz); compressed air at 0.6–0.8 MPa; cooling water loop for injection machines.
Daily Production CapacityPlastic chain: 8,000–20,000 m/day; finished plastic zippers: 10,000–25,000 pcs/day for sizes #3–#10, depending on mold count and shift pattern.
Estimated Gross Margin18%–30% on finished plastic zippers; in-house dyeing or lacquering and a larger mold inventory support higher utilization and margin.
Typical Investment Range$100,000–180,000 for a complete mid-size plastic line including injection machines, molds, sealing and cutting equipment.
Typical Payback Period12–24 months at 70% average utilization with steady order volume.

Quality First

  • Dry POM material before every injection run
  • Check teeth dimensions and pitch hourly
  • Test slider glide and pull force per batch
  • Keep color samples and lot records for traceability

Workshop & Power

  • Keep injection area dust-controlled and ventilated
  • Provide a stable cooling water loop
  • Store molds in a clean, dry rack system
  • Use stable three-phase power with surge protection

People & Profit

  • Train mold-change and maintenance staff
  • Schedule QC checks at every process handover
  • Gross margin target: 18%–30%
  • Payback target: 12–24 months

Note: figures are planning references for typical QLQ-equipped lines. Actual requirements vary with product mix, automation level, shift pattern, local power standards and environmental regulations.

Planning a plastic zipper plant? Contact QLQ Machinery for a complete line layout, mold recommendation, machine list and quotation based on your target daily output.

How to Make Plastic Open-end Finished Zipper with Pin Pin (Solution 1)
How to Make Plastic Open-end Finished Zipper with Pin Box (Solution 1)